Horb high bridge construction site. Once completed in 2028, the bridge will relieve the town of Horb of through traffic. The 667-metre-long and up to 90-metre-high Neckar Valley Bridge on the B 32 federal road is set to cost around 167 million euros. Horb, Baden-Württemberg, Germany
Caption

Horb high bridge construction site. Once completed in 2028, the bridge will relieve the town of Horb of through traffic. The 667-metre-long and up to 90-metre-high Neckar Valley Bridge on the B 32 federal road is set to cost around 167 million euros. Horb, Baden-Württemberg, Germany

Date

Jul 01, 2025

Credit line

Photo12/imageBROKER/Arnulf Hettrich

Reference

BRK26A35_483

Model release

No

Property release

No

License type

Royalty free

Available size

68.9Mb (8.3Mb) / 21.8in x 12.3in / 6545 x 3677 (300dpi)

Please log in to download the high resolution file