Caption
Tunnel construction, removal of rock debris during the construction of the Mont-Cenis tunnel, a 13.7 kilometre long railway tunnel in the Alps between the French Maurienne valley and the Italian Susa valley, around 1865, digitally enhanced reproduction of a 19th century model, historical, exact date unknown
Date
Jun 26, 2025
Credit line
Photo12/imageBROKER/Sunny Celeste
Reference
BRK26A34_231
Model release
No
Property release
No
License type
Royalty free
Available size
129,0Mb (11,0Mb) / 26,5in x 18,9in / 7952 x 5672 (300dpi)