Caption
Rehabilitation of the A52 motorway near Essen, an 8 km long section between the Essen-Kettwig junction and the Essen-Ost motorway junction was completely renovated over a period of 9 years, 6 lanes, new drainage pipes, carriageway, bridges, noise barriers, traffic facilities, here the last section, direction Düsseldorf, new carriageway surface, laying of porous asphalt, asphalt paver applies the whispering asphalt, at the Essen-Rüttenscheid junction, North Rhine-Westphalia, Germany
Date
07 août 2025
Credit line
Photo12/imageBROKER/Jochen Tack
Reference
BRK25M81_311
Model release
Non
Property release
Non
License type
Droits gérés
Available size
133.7Mo (12.8Mo) / 70.9cm x 47.3cm / 8373 x 5582 (300dpi)