Caption
Construction site on the left bank of the Rhine for the new construction of the second motorway bridge of the A1 over the Rhine near Leverkusen, after completion of the first bridge, the old one was demolished, the second part of the bridge, for a total of 8 lanes, is currently being rebuilt at the same location, Leverkusen, North Rhine-Westphalia, Germany
Date
Jul 16, 2025
Credit line
Photo12/imageBROKER/Jochen Tack
Reference
BRK25M42_411
Model release
No
Property release
No
License type
Rights managed
Available size
168.9Mb (7.5Mb) / 20.9in x 31.4in / 6274 x 9411 (300dpi)