Reconstruction in the Ahr Valley, after the flood of July 2021, restoration of the railway infrastructure of the Ahr line, 29 km of tracks, 15 railway bridges, 7 were renovated, stations and stops renovated or renewed, 885 masts were built for the overhead line of the new electrification and 55 km of overhead lines were redrawn, here work on the cycle path bridge and railway bridge near Altenahr, Rhineland-Palatinate