
Caption
Track construction from the air. At Bad Cannstatt railway station, a transport helicopter transports 26 catenary masts to their destination. The masts, weighing up to 2.4 tonnes, were delivered by rail. The reason for this is to improve the infrastructure as part of the Stuttgart 21 project. Stuttgart, Baden-Württemberg, Germany
Date
Sep 02, 2025
Credit line
Photo12/imageBROKER/Arnulf Hettrich
Reference
BRK25I58_355
Model release
No
Property release
No
License type
Royalty free
Available size
88,9Mb (2,0Mb) / 22,6in x 15,3in / 6781 x 4583 (300dpi)