
Caption
Repair Works at a canal lock in North Rhine-Westphalia, along the Wesel-Datteln Canal. The larger lock was completed in 1928 and has lift gates at both ends. It is 222 meters long, 12 meters wide and is designed for a draft of 2.80 meters, with a filling capacity of 26, 500 cubic meters. The inset bollards needed to be replaced in 2022
Date
Nov 05, 2022
Credit line
Photo12/imageBROKER/Rudy Fessel
Reference
BRK25F80_360
Model release
No
Property release
No
License type
Royalty free
Available size
57,1Mb (6,2Mb) / 18,2in x 12,2in / 5472 x 3648 (300dpi)