Repair Works at a canal lock in North Rhine-Westphalia, along the Wesel-Datteln Canal. The larger lock was completed in 1928 and has lift gates at both ends. It is 222 meters long, 12 meters wide and is designed for a draft of 2.80 meters, with a filling capacity of 26, 500 cubic meters. The inset bollards needed to be replaced in 2022
Caption

Repair Works at a canal lock in North Rhine-Westphalia, along the Wesel-Datteln Canal. The larger lock was completed in 1928 and has lift gates at both ends. It is 222 meters long, 12 meters wide and is designed for a draft of 2.80 meters, with a filling capacity of 26, 500 cubic meters. The inset bollards needed to be replaced in 2022

Date

Nov 05, 2022

Credit line

Photo12/imageBROKER/Rudy Fessel

Reference

BRK25F62_310

Model release

No

Property release

No

License type

Royalty free

Available size

57,1Mb (6,8Mb) / 18,2in x 12,2in / 5472 x 3648 (300dpi)

Please log in to download the high resolution file