
Caption
Theme photo Emscher conversion, the Emscher system will be wastewater-free in 2021 - new construction of a sewer on the Boye, the second largest tributary of the Emscher, the tunnelling machine digs the tunnel for the DN 3500 concrete wastewater pipes, the Boye is renaturalised, will be transformed into a near-natural watercourse, was previously an open, The ecological conversion of the Emscher system consists of the construction of a central wastewater treatment system in the Ruhr area, the construction of sewers and the renaturalisation of the Emscher and its tributaries, archive photo from 13.11.2014, Bottrop, Ruhr area, North Rhine-Westphalia, Germany, Europe
Date
Mar 08, 2021
Credit line
Photo12/imageBROKER/Rupert Oberhäuser
Reference
BRK25D77_211
Model release
NA
Property release
No
License type
Rights managed
Available size
63,3Mb (4,4Mb) / 19,2in x 12,8in / 5760 x 3840 (300dpi)