Caption
Construction of a 480 metre long bridge for the new light rail line U81, over the Nordsternkreuz, over the A44 and the B8 at Düsseldorf Airport, the bridge sections are moved on 5 piers using the incremental launching method after assembly, North Rhine-Westphalia, Germany, Europe
Date
Mar 23, 2022
Credit line
Photo12/imageBROKER/Jochen Tack
Reference
BRK25B96_156
Model release
No
Property release
No
License type
Rights managed
Available size
120.7Mb (5.7Mb) / 26.5in x 17.7in / 7952 x 5304 (300dpi)