Caption
Assembly of an Enercon E-138 wind turbine, the stator, part of the generator is pulled to the nacelle by a large crawler crane, Ahlen wind farm, Münsterland, North Rhine-Westphalia, Germany, Europe
Date
Dec 11, 2024
Credit line
Photo12/imageBROKER/Jochen Tack
Reference
BRK25A56_114
Model release
No
Property release
No
License type
Rights managed
Available size
139.5Mb (5.5Mb) / 26.9in x 20.2in / 8064 x 6048 (300dpi)