Caption
Welder in a tunnel section of the double shield tunnel boring machine in the H53 construction lot of the Brenner Base Tunnel, Tyrol, Austria, Europe
Date
Nov 28, 2024
Credit line
Photo12/imageBROKER/Florian Bachmeier
Reference
BRK24I63_354
Model release
No
Property release
No
License type
Rights managed
Available size
146.3Mb (12.2Mb) / 27.5in x 20.6in / 8256 x 6192 (300dpi)