Caption
Construction of a new line route, 380 KV extra-high voltage line between Osterath and Gohr, near Neuss, fitters in cable trolleys, on the conductor cables, installing field spacers at great heights, wind power station, North Rhine-Westphalia, Germany, Europe
Date
Mar 29, 2021
Credit line
Photo12/imageBROKER/Jochen Tack
Reference
BRK24I24_462
Model release
No
Property release
No
License type
Rights managed
Available size
120.7Mb (4.9Mb) / 26.5in x 17.7in / 7952 x 5304 (300dpi)