Berkhamsted Station
Title

Berkhamsted Station

Caption

Berkhamsted Station, Hertfordshire, on the London and Birmingham Railway, c1860. On top of the building on the left is a water tank for supplying locomotives while, on the right, cattle are being driven to the station over a bridge crossing the Grand Junction Canal. The London and Birmingham railway was completed by the autumn of 1838. Robert Stephenson (1803-1859) was the Chief Engineer. Many people opposed the route and forced Stephenson to move the line some distance from their towns. The 112 mile line took 20,000 men 5 years to build. From "The Land We Live In". (London, c1860). Engraving.

Info+

Photos12.com - Ann Ronan Picture Library

Credit line

Photo12/Ann Ronan Picture Library

Reference

ARP07104_460001209

License type

Rights managed

Available size

25,2Mb (2,8Mb) / 11,8in x 8,3in / 3543 x 2483 (300dpi)

Please log in to download the high resolution file